The PANAMA CANAL Construction The length of the Panama Canal is approximately 51 miles. A trip along the canal from its Atlantic entrance would take you through a 7 mile dredged channel in Limón Bay. The canal then proceeds for a distance of 11.5 miles to the Gatun Locks. This series of three locks raise ships 26 metres to Gatun Lake. It continues south through a channel in Gatun Lake for 32 miles to Gamboa, where the Culebra Cut begins. This channel through the cut is 8 miles long and 150 metres wide. At the end of this cut are the locks at Pedro Miguel. The Pedro Miguel locks lower ships 9.4 metres to a lake which then takes you to the Miraflores Locks which lower ships 16 metres to sea level at the canals Pacific terminus in the bay of Panama.
HOME HOME FOUNDATION  FOUNDATION INDUSTRIAL AND PORT TIRES INDUSTRIAL AND PORT TIRES OTR MINING TIRES OTR MINING TIRES OTR CONSTRUCTION TIRES OTR CONSTRUCTION TIRES HEAVY AND MED TRUCK TIRES HEAVY AND MED TRUCK TIRES CONTACT CONTACT ABOUT US  ABOUT US GALLERIE  GALLERIE NEWS NEWS © Resources International Network Inc. 1999 OTR CONSTRUCTION TIRES OTR CONSTRUCTION TIRES